A sample case study of aFull pool resurfacing
Learn about our process for replacing worn pool surfaces and waterline tile. This is a sample project for our demonstration site.
- Free renovation consultation
- Two years on workmanship
How we renovated thisGreen Valley pool
This sample walks through a complete interior update to handle hard water wear.
The problem
The problem
Fifteen years of hard Las Vegas water had left the original plaster rough, stained and coated with calcium scale. The waterline tile was also severely marked.
What we did
What we did
We met with the owners for a free consultation and drafted a written proposal. Our crew drained the water to the sanitary sewer, removed the old tile, and applied a durable new pebble finish.
The result
The result
The fresh pebble surface and new coping gave the pool an updated appearance. We completed the startup chemistry that follows the plaster maker’s schedule.
More about thisRenovation process
Plaster and pebble finishes are natural materials. Color variation and normal wear are not defects, and we back our resurfacing and tile workmanship with a two-year warranty.
Startup chemistry for the new finish follows the plaster maker’s schedule.
- Free consultation
- Waterline tile replacement
- Pebble finish application
- New surface startup

This project is a sample written for this demonstration site. It shows the kind of work and write-up a live site would publish.
Ready to plan yourPool resurfacing project
Schedule a free consultation to talk about your renovation ideas.
